Works within Project “Emergency measures and flood risk management” for water erosion protection, for municipality Čelinac and Vrbanja River, are continuing in the planned schedule. Currently works are carried out on stone bank revetment and
22 Mar, 2014
EKO – EUROTIM successfully finished the Project for protection of bridge footer and river bank, with making of bank revetment on the location “Žuti Most“on Vrbanja river near Banja Luka.
Installation of bentonite and PEHD foil on the remediation of the landfill in Ramici and construction of new sanitary tank. The entire job was completed in August 2013.
27 Jan, 2014
Construction of water supply pipelines for small hydropower plant „Grabovička Rijeka“, Kotor Varos. Investitor: “E Promet” Kotor Varoš